Max Prefabs has manufactured, shipped and assembled 1.500 m2 prefabricated steel office, prefabricated construction site cafeteria and prefabricated construction site accommodation buildings on Marmara Island. Production time is only 20 days and assembly time is 25 days in total. All materials are certified and galvanized metal chassis, columns, roof trusses and purlins are used. Exterior and interior coating is fibercement board. All Electrical and Mechanical Works are covered.

COUNTRY

TURKIYE

CATEGORY

PREFABRICATED BUILDINGS

YEAR

2023

TOTAL AREA

1.500 M2