Maxprefabs has been completed 4.500 m2 pipe line building in Tripoli, Libya in 2014. All the materials are produced at Maxprefabs’s factory in Istanbul. The walls and roof covered by well insulated sandwich panels. The system is based on rolled formed steel structure. The building components have been shipped into 40 FT HC and 40 FT OT containers. Maxprefabs provided supervising service for installation process.

COUNTRY

TRIPOLI, LIBYA

CATEGORY

STEEL WAREHOUSES / HANGARS

YEAR

2014

TOTAL AREA

4.500 m2