Maxprefabs have been continued for the production, shipment and installation processes of 320 units of 240x600 cm flat pack containers for military accomodation project in Riga, Latvia.
The main structure was manufactured by LGS system. The walls and roof are covered by fire rated sandwich panels. Fibercement board and vinyl were used as floor covering. All the Electrical and mechanical parts are supplied together with the flat pack containers in Latvia.
All the materials used for the project are CE certified and flat pack containers manufactured in accordance with EN1090 requirements.
All the flat pack containers for Lativa project was shipped by land way. The transit time from Istanbul to Riga is 7-8 days only.

COUNTRY

RIGA/LATVIA

CATEGORY

CONTAINER

YEAR

2024

TOTAL AREA

4.608 m2